Project Details

Cargo Details:

  • 420MT / 12,000CBM single super lift
  • 39 packages totalling 120MT / 1500CBM
  • 300+ special size/general size container loads (OT/OTHQ/FR and     standard containers)

Seaway’s Role:

  • Concept to completion involvement
  • Lift plans and design of super-lift
  • Multiple offshore site inspections and check measures
  • Charter vessel arrangements
  • Liaison with harbor master for concept approvals
  • Design and implementation of stabilising support for boom in     transit + purchase of steel/equipment & certification of same.
  • Design and implementation of spacer barge concept
  • Construction of purpose-built fenders
  • Super-lift and placement of cargo on rails/wharf
  • Berth shift to permit the unload of additional cargo at opposite     end of berth

Scope of Works:

  • Detailed lift plans and design
  • Chartering appropriate vessels
  • Loading and unloading logistics
  • Spacer barge design and implementation
  • Construction of purpose-built fenders

‍

Highlights & Innovations

‍Highlights:

  • Successfully lifting a 420MT / 12,000CBM super-lift structure with existing infrastructure in situ.
  • Use of innovative barge build-up and Yoko fenders for clearance

Challenges:

  • Working with existing infrastructure limitations (50mm tolerance on 3 sides when placing super-structure)
  • Ensuring placement on reinforced rails/wharf

Innovations:

  • Barge build-up and fender construction using Yoko fenders for     clearance

‍Unique Safety Considerations:

  • Approval from harbor master for all drawings and plans
  • Design and implementation of spacer barge for safety clearance

UniqueEnvironment Considerations:

  • Direct access to wharf
  • Adapting to existing infrastructure limitations

‍

‍

‍

‍

‍